Recent changes

From Bay Area Structural Heart Wiki

Track the most recent changes to the wiki on this page.

Recent changes options Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Hide my edits | Show bots | Hide minor edits
Show new changes starting from 00:47, 15 December 2025
 
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

9 December 2025

     22:41  CPMC VanNess Electrophysiology diffhist +44 Rosenbzj talk contribs (Misc resource) Tag: Visual edit
N    22:40  AveirInterrogation diffhist +606 Rosenbzj talk contribs (Created page with "-The Avier 5-lead is located below the St. Jude Programmer. It only works with the larger/older St. Jude Programmer. Prior to device interrogation/reprogramming: 1) Turn RF generator off 2) Turn Amp off 3) Turn magnet off (keep PIU on) Out of the two torso diagrams on the 5-lead box, use the one on the left (patient cable 3625) to place the leads. The Aveir Programmer will read N/A for 1-2 min after turning the magnet off if Amp & RF generator are already off, th...")