Tricuspid ViV: Difference between revisions
From Bay Area Structural Heart Wiki
No edit summary |
No edit summary |
||
Line 15: | Line 15: | ||
|} | |} | ||
== Supplies == | ==Supplies== | ||
* Standard TAVR backtable setup | *Standard TAVR backtable setup | ||
* 8F Sheath | *8F Sheath | ||
* 150 J | *150 J | ||
* 260J | *260J | ||
* Safari | *Safari | ||
* Alligator Clip Pacing cable | *Alligator Clip Pacing cable | ||
* 6F Angled Pigtail | *6F Angled Pigtail | ||
* 0 Prolene | *0 Prolene | ||
* Micropuncture (for woggle only) | *Micropuncture (for woggle only) | ||
Standby: | Standby: | ||
* Agilis | *Agilis | ||
* 6F balloon wedge | *6F balloon wedge | ||
<br /> | <br /> | ||
== Procedure == | ==Procedure== | ||
* Single Venous access | *Single Venous access | ||
* Single Preclose | *Single Preclose | ||
* 8F Sheath inserted | *8F Sheath inserted | ||
* Pigtail and J wire advanced to RV | *Pigtail and J wire advanced to RV | ||
* J wire exchanged for Safari | *J wire exchanged for Safari | ||
** Shave back of Safari for pacing | **Shave back of Safari for pacing | ||
* Valve delivery system advanced | * Sheath exchanged for E Sheath | ||
* Pacer tested | *Valve delivery system advanced | ||
* Valve deployed | *Pacer tested | ||
* Safari exchanged for J wire | *Valve deployed | ||
* Perclose completed and woggle placed. | *Safari exchanged for J wire | ||
* Voila. | *Perclose completed and woggle placed. | ||
*Voila. | |||
<br /> | <br /> |
Revision as of 00:01, 12 September 2020
Anesthesia | Imaging | Access | ACIST | Manifold |
---|---|---|---|---|
MAC | Fluoro, TTE |
Femoral Vein |
No | No |
Supplies
- Standard TAVR backtable setup
- 8F Sheath
- 150 J
- 260J
- Safari
- Alligator Clip Pacing cable
- 6F Angled Pigtail
- 0 Prolene
- Micropuncture (for woggle only)
Standby:
- Agilis
- 6F balloon wedge
Procedure
- Single Venous access
- Single Preclose
- 8F Sheath inserted
- Pigtail and J wire advanced to RV
- J wire exchanged for Safari
- Shave back of Safari for pacing
- Sheath exchanged for E Sheath
- Valve delivery system advanced
- Pacer tested
- Valve deployed
- Safari exchanged for J wire
- Perclose completed and woggle placed.
- Voila.