Watchman: Difference between revisions

From Bay Area Structural Heart Wiki
Dronsfj (talk | contribs)
Created page with " '''WATCHMAN : LEFT ATRIAL APPENDAGE CLOSURE''' '''Procedure Case Log''' TIPS FOR STAFF # Look up patient. Make sure Type & Screen completed prior to pickup. # Cath Lab st..."
 
Holts3 (talk | contribs)
mNo edit summary
 
(23 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{| class="wikitable"
! colspan="4" |Watchman - Left Atrial appendage closure
|-
!Anesthesia
!Imaging
!Access
!ACIST/manifold
|-
|General
|Fluoro and TEE
|
*14F RFV


|One manifold with contrast
|-


'''WATCHMAN : LEFT ATRIAL APPENDAGE CLOSURE'''
! colspan="4" |Pre-Procedure Watchouts
|-
| colspan="4" |
'''PRE PROCEDURE: Type and Screen'''
|}


'''Procedure Case Log'''
====Open====


TIPS FOR STAFF
*Micropuncture
*8fr sheath (dilator used pre-Perclose)
*Probe cover
*1 Perclose
**0-Prolene or 0-PDS (Spies will add a suture after perclose if site is oozing. If no ooze Exofin.)


# Look up patient. Make sure Type & Screen completed prior to pickup.
* Cordis 150J
# Cath Lab staff pick up patient
 
# Circulating RN initiate Anesthesia SIGN-IN/Time Out
*6fr Straight Pigtail
# Anesthesia intubates patient & '''no longer''' '''placing arterial line'''. Give prophylaxis Ancef IV
*3-port manifold
# TEE performed. Procedure '''aborted''' if '''clot'''  
*Baylis VersaCross Access System (purple box in structural cart)
# Prep patient & drape: Bilateral groin & bilateral clavicle to SUBZYPHOID
*Grounding pad
# Micropuncture ultrasound-guided RFV access
*(Spies - Lido with EPI)
# 5 Fr Micropuncture sheath
 
# 150 cm J Wire
====Standby====
# 6 Fr Perclose pre-close RFV
 
# 8 Fr dilator
*4 or 5fr Pinnacle for Arterial line
# 8.5 Fr SL 1 Sheath
 
# TEE & fluro guided transeptal access & images of Left Atrial Appendage
*190 Supracore
# Anesthesia gives Heparin IV. ACT GOAL >250-300
*Wholey / Versacore
# Transeptal puncture with Large Curve C1 71cm Baylis Needle
 
# Measure LA pressure
===Watchman supplies:===
# Straight 260cm Super Stiff Amplatz wire to LA
 
# SL1 exchanged out for 14 Fr WATCHMAN delivery sheath either SINGLE, DOUBLE or ANTERIOR Curve
*14fr Watchman access sheath (Open as requested after TEE)
# 6 Fr Str Pigtail to LAA. Angiogram of appendage
*Watchman device (Size as requested after TEE)
# Measure and select size of Watchman device
 
# Open and insert Watchman Device (Size: 21, 24, 27, 30, 33mm)
===PROCEDURE===
# Deploy Device. Confirm placement to meet PASS criteria: '''P'''osition '''A'''nchor, '''S'''ize, '''S'''eal. Can be recaptured/reposition. Fully unscrew to deploy device.
 
# Placement confirmed by LA angiogram
#Basic table set up ONLY until it is determined by TEE that case will proceed.
# Pull out pigtail & delivery guidecatheter
#TEE performed. Procedure '''aborted''' if '''clot'''
# Deploy Perclose Vein. SPIES: Hemostatic surgical suture. MD removes later.
#Prep bilateral groins and drape once probe has been inserted.
# Patient disposition
#Micropuncture ultrasound-guided RFV access
## If device deployed → PACU → ICU Stepdown.
#5 Fr Micropuncture sheath  
## If case cancelled →PACU → Post Op → Home
#Baby J wire from sheath
#8 Fr dilator
#6 Fr Perclose pre-close RFV.  .032 wire inserted after preclosure deployment.
#.035 J wire from versacross system advanced thru perclose for Baylis sheath advancement.
#.035 J wire removed, VersaCross RF pigtail wire advanced for transeptal puncture.
#TEE & fluoro guided transeptal access & images of Left Atrial Appendage
#Anesthesia gives Heparin IV. ACT GOAL >250-300
#Transeptal puncture, ACT drawn from LA.
#Measure LA pressure
#15 Fr WATCHMAN delivery sheath either SINGLE, DOUBLE or ANTERIOR Curve
#Backloaded 6 Fr Str Pigtail advanced to the LAA
#Hook pigtail up to manifold for angiogram of LAA
#Measure and select size of Watchman device
#Open and prep Watchman Device -
#*Open touhy
#*Exercise delivery
#*Advance feet of device to just inside of marker
#*Leave touhy open and attach to manifold with pressurized hep saline open, close touhy and flush to device. Tap through delivery system while flushing. (Size: 21, 24, 27, 30, 33mm)
#Pigtail removed just prior to delivery system insertion.
#Insert delivery with a wet-to-wet connection (leaving pressurized saline on)
#Once inserted, begin filling delivery system with contrast.  Delivery system takes 20ml to fill.
#Deploy Device. Confirm placement to meet PASS criteria: '''P'''osition '''A'''nchor, '''S'''ize, '''S'''eal. Can be recaptured/reposition. Fully unscrew to deploy device.
#Placement confirmed by LA angiogram
#Delivery system removed as MD tamps perclose knot.
#If access is clean, Dermabond. If bleeding, [[woggle]].
 
<br>
[[Category:Procedures]]
<HR />
APPROVED: MD initials MM/YY

Latest revision as of 20:37, 30 May 2025

Watchman - Left Atrial appendage closure
Anesthesia Imaging Access ACIST/manifold
General Fluoro and TEE
  • 14F RFV
One manifold with contrast
Pre-Procedure Watchouts

PRE PROCEDURE: Type and Screen

Open

  • Micropuncture
  • 8fr sheath (dilator used pre-Perclose)
  • Probe cover
  • 1 Perclose
    • 0-Prolene or 0-PDS (Spies will add a suture after perclose if site is oozing. If no ooze Exofin.)
  • Cordis 150J
  • 6fr Straight Pigtail
  • 3-port manifold
  • Baylis VersaCross Access System (purple box in structural cart)
  • Grounding pad
  • (Spies - Lido with EPI)

Standby

  • 4 or 5fr Pinnacle for Arterial line
  • 190 Supracore
  • Wholey / Versacore

Watchman supplies:

  • 14fr Watchman access sheath (Open as requested after TEE)
  • Watchman device (Size as requested after TEE)

PROCEDURE

  1. Basic table set up ONLY until it is determined by TEE that case will proceed.
  2. TEE performed. Procedure aborted if clot
  3. Prep bilateral groins and drape once probe has been inserted.
  4. Micropuncture ultrasound-guided RFV access
  5. 5 Fr Micropuncture sheath
  6. Baby J wire from sheath
  7. 8 Fr dilator
  8. 6 Fr Perclose pre-close RFV. .032 wire inserted after preclosure deployment.
  9. .035 J wire from versacross system advanced thru perclose for Baylis sheath advancement.
  10. .035 J wire removed, VersaCross RF pigtail wire advanced for transeptal puncture.
  11. TEE & fluoro guided transeptal access & images of Left Atrial Appendage
  12. Anesthesia gives Heparin IV. ACT GOAL >250-300
  13. Transeptal puncture, ACT drawn from LA.
  14. Measure LA pressure
  15. 15 Fr WATCHMAN delivery sheath either SINGLE, DOUBLE or ANTERIOR Curve
  16. Backloaded 6 Fr Str Pigtail advanced to the LAA
  17. Hook pigtail up to manifold for angiogram of LAA
  18. Measure and select size of Watchman device
  19. Open and prep Watchman Device -
    • Open touhy
    • Exercise delivery
    • Advance feet of device to just inside of marker
    • Leave touhy open and attach to manifold with pressurized hep saline open, close touhy and flush to device. Tap through delivery system while flushing. (Size: 21, 24, 27, 30, 33mm)
  20. Pigtail removed just prior to delivery system insertion.
  21. Insert delivery with a wet-to-wet connection (leaving pressurized saline on)
  22. Once inserted, begin filling delivery system with contrast. Delivery system takes 20ml to fill.
  23. Deploy Device. Confirm placement to meet PASS criteria: Position Anchor, Size, Seal. Can be recaptured/reposition. Fully unscrew to deploy device.
  24. Placement confirmed by LA angiogram
  25. Delivery system removed as MD tamps perclose knot.
  26. If access is clean, Dermabond. If bleeding, woggle.



APPROVED: MD initials MM/YY