Tricuspid ViV: Difference between revisions

From Bay Area Structural Heart Wiki
No edit summary
No edit summary
 
(6 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{| class="wikitable"
{| class="wikitable"
|-
|-
Line 6: Line 7:
!ACIST
!ACIST
!Manifold
!Manifold
!Pacing
|-
|-
|MAC
|MAC
Line 13: Line 15:
|No
|No
|No
|No
|25 Output, 140-200bpm
|}
|}


Line 26: Line 29:
*0 Prolene
*0 Prolene
*Micropuncture (for woggle only)
*Micropuncture (for woggle only)
*Perclose and Nu-Knit


===Standby: ===


Standby:
*8.5F Agilis or TourGuide
 
*Double-pump-valve-cracker setup for BVF
*Agilis
*6F balloon wedge
*6F balloon wedge
 
*5F balloon tip pacer
<br />
Pacing - 25 Output, 140-200bpm


==Procedure==
==Procedure==


*Single Venous access
#Single Venous access
*Double Preclose
#Pre-close
*8F Sheath inserted
#8F Sheath inserted
*Pigtail and J wire advanced to RV
#Pigtail and J wire advanced to RV
*J wire exchanged for Safari
#J wire exchanged for Safari
**Shave back of Safari for pacing
#Sheath exchanged for E Sheath
* Sheath exchanged for E Sheath
#Valve delivery system advanced
*Valve delivery system advanced
#Pacer tested
*Pacer tested
#Valve deployed
*Valve deployed
#Safari exchanged for J wire
*Safari exchanged for J wire
#Perclose completed and woggle placed.
*Perclose completed and woggle placed.
#Voila.
*Voila.


<br />
<br />
<HR>
<HR>
[[Category:Procedures]]
[[Category:Procedures]]

Latest revision as of 22:58, 21 February 2024

Anesthesia Imaging Access ACIST Manifold Pacing
MAC Fluoro, TTE

Femoral Vein

No No 25 Output, 140-200bpm

Supplies

  • Standard TAVR backtable setup
  • 8F Sheath
  • 150 J
  • 260J
  • Safari
  • Alligator Clip Pacing cable
  • 6F Angled Pigtail
  • 0 Prolene
  • Micropuncture (for woggle only)
  • Perclose and Nu-Knit

Standby:

  • 8.5F Agilis or TourGuide
  • Double-pump-valve-cracker setup for BVF
  • 6F balloon wedge
  • 5F balloon tip pacer

Pacing - 25 Output, 140-200bpm

Procedure

  1. Single Venous access
  2. Pre-close
  3. 8F Sheath inserted
  4. Pigtail and J wire advanced to RV
  5. J wire exchanged for Safari
  6. Sheath exchanged for E Sheath
  7. Valve delivery system advanced
  8. Pacer tested
  9. Valve deployed
  10. Safari exchanged for J wire
  11. Perclose completed and woggle placed.
  12. Voila.