Tricuspid ViV: Difference between revisions
From Bay Area Structural Heart Wiki
(Created blank page) |
No edit summary |
||
(10 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{| class="wikitable" | |||
|- | |||
!Anesthesia | |||
!Imaging | |||
!Access | |||
!ACIST | |||
!Manifold | |||
!Pacing | |||
|- | |||
|MAC | |||
|Fluoro, TTE | |||
| | |||
Femoral Vein | |||
|No | |||
|No | |||
|25 Output, 140-200bpm | |||
|} | |||
==Supplies== | |||
*Standard TAVR backtable setup | |||
*8F Sheath | |||
*150 J | |||
*260J | |||
*Safari | |||
*Alligator Clip Pacing cable | |||
*6F Angled Pigtail | |||
*0 Prolene | |||
*Micropuncture (for woggle only) | |||
*Perclose and Nu-Knit | |||
===Standby: === | |||
*8.5F Agilis or TourGuide | |||
*Double-pump-valve-cracker setup for BVF | |||
*6F balloon wedge | |||
*5F balloon tip pacer | |||
Pacing - 25 Output, 140-200bpm | |||
==Procedure== | |||
#Single Venous access | |||
#Pre-close | |||
#8F Sheath inserted | |||
#Pigtail and J wire advanced to RV | |||
#J wire exchanged for Safari | |||
#Sheath exchanged for E Sheath | |||
#Valve delivery system advanced | |||
#Pacer tested | |||
#Valve deployed | |||
#Safari exchanged for J wire | |||
#Perclose completed and woggle placed. | |||
#Voila. | |||
<br /> | |||
<HR> | |||
[[Category:Procedures]] |
Latest revision as of 22:58, 21 February 2024
Anesthesia | Imaging | Access | ACIST | Manifold | Pacing |
---|---|---|---|---|---|
MAC | Fluoro, TTE |
Femoral Vein |
No | No | 25 Output, 140-200bpm |
Supplies
- Standard TAVR backtable setup
- 8F Sheath
- 150 J
- 260J
- Safari
- Alligator Clip Pacing cable
- 6F Angled Pigtail
- 0 Prolene
- Micropuncture (for woggle only)
- Perclose and Nu-Knit
Standby:
- 8.5F Agilis or TourGuide
- Double-pump-valve-cracker setup for BVF
- 6F balloon wedge
- 5F balloon tip pacer
Pacing - 25 Output, 140-200bpm
Procedure
- Single Venous access
- Pre-close
- 8F Sheath inserted
- Pigtail and J wire advanced to RV
- J wire exchanged for Safari
- Sheath exchanged for E Sheath
- Valve delivery system advanced
- Pacer tested
- Valve deployed
- Safari exchanged for J wire
- Perclose completed and woggle placed.
- Voila.