Tricuspid ViR: Difference between revisions

From Bay Area Structural Heart Wiki
No edit summary
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
THIS PAGE IS BASED OFF THE 1 PREVIOUS TVIR.  VERY PRELIMINARY.
Due to the open nature of the tricuspid surgical ring, PVL is highly likely post transcatheter valve placement.
Due to the open nature of the tricuspid surgical ring, PVL is highly likely post transcatheter valve placement.




Line 17: Line 21:
|No
|No
|}
|}
==Supplies==
===Open:===
*Standard TAVR backtable setup with Certitude delivery system
*8F Sheath
*150 J
*260J
*Safari
*Alligator Clip Pacing cable
*6F Angled Pigtail
*0 Prolene
*Micropuncture
*Perclose x 1
===Standby: ===
*Sizing Balloon?
*5F MPA
*8.5F TourGuide
*Agilis
*6F balloon wedge
*Pacing Supplies
==PVL Closure:==
* Plug Cart in room.  May be ASO, Cardioform, or AVP2
* Standard Glidewire for crossing
* Amplatz ES if using Trevisio/Torqvue
==Procedure==
#IJ access
#Single preclose
#Certitude Sheath Advanced
#Pigtail and J wire advanced to RV
#J wire exchanged for Safari
#*Shave back of Safari for pacing
#Valve delivery system advanced
#Pacer tested
#Valve deployed
#Safari exchanged for J wire
#Perclose completed and woggle placed.
#Voila.
<br />
<HR>
[[Category:Procedures]]

Latest revision as of 22:19, 8 December 2021

THIS PAGE IS BASED OFF THE 1 PREVIOUS TVIR. VERY PRELIMINARY.


Due to the open nature of the tricuspid surgical ring, PVL is highly likely post transcatheter valve placement.


Anesthesia Imaging Access ACIST Manifold
GA Fluoro, TEE

LEFT IJ Vein

No No

Supplies

Open:

  • Standard TAVR backtable setup with Certitude delivery system
  • 8F Sheath
  • 150 J
  • 260J
  • Safari
  • Alligator Clip Pacing cable
  • 6F Angled Pigtail
  • 0 Prolene
  • Micropuncture
  • Perclose x 1

Standby:

  • Sizing Balloon?
  • 5F MPA
  • 8.5F TourGuide
  • Agilis
  • 6F balloon wedge
  • Pacing Supplies


PVL Closure:

  • Plug Cart in room. May be ASO, Cardioform, or AVP2
  • Standard Glidewire for crossing
  • Amplatz ES if using Trevisio/Torqvue

Procedure

  1. IJ access
  2. Single preclose
  3. Certitude Sheath Advanced
  4. Pigtail and J wire advanced to RV
  5. J wire exchanged for Safari
    • Shave back of Safari for pacing
  6. Valve delivery system advanced
  7. Pacer tested
  8. Valve deployed
  9. Safari exchanged for J wire
  10. Perclose completed and woggle placed.
  11. Voila.