Valve in MAC with Antegrade Lampoon: Difference between revisions

From Bay Area Structural Heart Wiki
No edit summary
Line 6: Line 6:
https://www.jtcvs.org/article/S0022-5223(18)31545-9/pdf
https://www.jtcvs.org/article/S0022-5223(18)31545-9/pdf


=== Access sites: ===
===Access sites:===
24F RFV
24F RFV


Line 14: Line 14:
<br />
<br />


=== Open: ===
===Open:===
Standard Basilica Equipment
Standard Basilica Equipment


Standard Transeptal Equipment
Standard Transeptal Equipment


Standard TMVR Equipment (no Safari?)
Standard TMVR Equipment  


??Sentinel Equipment**
??Sentinel Equipment**
Safari


24F Dryseal
24F Dryseal
Line 33: Line 35:
Balloon Pump
Balloon Pump


6F JR4 Guide
6F JR4 Guide/ 6F MP


6F JL3.5 Guide
6F JL3.5 Guide
Line 50: Line 52:
<br />
<br />


=== Standby: ===
===Standby:===
12F Flexcath
12F Flexcath


Line 58: Line 60:
<br />
<br />


=== Rough Procedural Plan: ===
===Rough Procedural Plan:===
Obtain access as listed above.
Obtain access as listed above.


Line 75: Line 77:
Runthrough in 6F JR4 and snared through 7F in LV
Runthrough in 6F JR4 and snared through 7F in LV


6F JR4 removed and reinserted over .032 wire---- or 6FMP??
6F JR4 removed and reinserted over .032 wire---- or '''6FMP'''??


Lampoon equipment advanced through 6F JR4/MP
Lampoon equipment advanced through 6F JR4/MP
Line 95: Line 97:
Lampoon system deconstructed.
Lampoon system deconstructed.


Pigtail advanced with **amplatz super stiff?**
Pigtail advanced with Safari


Pigtail out.
Pigtail out.

Revision as of 23:00, 23 September 2020

General Anesthesia, TEE


MAC- Mitral Annular Calcification

https://www.jtcvs.org/article/S0022-5223(18)31545-9/pdf

Access sites:

24F RFV

8F LFV

8F LFA

Open:

Standard Basilica Equipment

Standard Transeptal Equipment

Standard TMVR Equipment

??Sentinel Equipment**

Safari

24F Dryseal

(2) Agilis sm curl

300 cm Runthrough wire

14mm Armada Balloon

Balloon Pump

6F JR4 Guide/ 6F MP

6F JL3.5 Guide

7F JR4 Guide

18/30 Ensnare

25mm Gooseneck snare

Preclose x 2

0 Ethibond

0 Prolene

Standby:

12F Flexcath

6F MP Guide

7F Langston

Rough Procedural Plan:

Obtain access as listed above.

Preclose RFV x 2

SL1- transeptal puncture

SL1 exchanged for 24F Dryseal

Agilis x 2 inserted

7F JR4 with ensnare to LFA

6F JR4 through one of the agilis.

Runthrough in 6F JR4 and snared through 7F in LV

6F JR4 removed and reinserted over .032 wire---- or 6FMP??

Lampoon equipment advanced through 6F JR4/MP

6FJL3.5 advanced over Runthrough

25mm snare through JL3.5

Anterior leaflet traversed.-- Test bovie at 30 cut. Increase to 70 cut for traversal and laceration.

After leaflet traversal and system snared- 7F guide and Runthrough removed.

Balloon pump inserted.

Pacer inserted.

Leaflet lacerated.

Lampoon system deconstructed.

Pigtail advanced with Safari

Pigtail out.

Septostomy

Valve inserted and deployed.

Pigtail for wire removal



*ECMO??

*Possible ASD Closure

*Flow monitor on left leg?